A SERVICE OF

logo

Calibration (continued)
5. Connect the liquid treatment tubing
to the elbow tting under the HCBT inlet hopper.
1/2” OD Chemical Pump Port
6. Hold the HCBT Pump switch
in MANUAL to deliver treatment product to the treater.
This jog switch will reset to OFF when released.
The system is calibrated. Treating may begin.
16.0
HCBT Pump Control Switch
HOLD