Graco 218413 Music Mixer User Manual


 
5307400
Installation
Grounding
Proper grounding is an essential part of maintaining a
safe system.
To reduce the risk of static sparking, ground the pump.
Check your local electrical code for detailed grounding
instructions for your area and type of equipment. Be
sure to ground all of this equipment:
1. Pump: use a ground wire and clamp as instructed
in your pump instruction manual.
2. Fluid hoses: Use only grounded hoses with a max-
imum of 500 feet (150 m) combined hose length to
ensure grounding continuity.
3. Spray gun, manifold, or dispensing valve: obtain
grounding through connection to a properly
grounded connection to a properly grounded fluid
hose and sprayer.
4. Object being sprayed: according to local code.
5. Supply Containers: according to local code.
6. All solvent pails used when flushing, according to
local code. Use only metal pails, which are con-
ductive. Do not place the pail on a nonconductive
surface, such as paper or cardboard, which
interrupts the grounding continuity.
7. To maintain grounding continuity when flushing or
relieving pressure, always hold a metal part of the
gun firmly to the side of a grounded metal pail,
then trigger the gun.
Installation (See Fig. 1)
For assistance in setting up a plural component sys-
tem, contact your Graco distributor. This will help as-
sure that you select the proper type and size equip-
ment for your job.
Use the spacer (40), screws (37), nuts (38) and lock-
washers (39) provided to mount the manifold.
Connect the supply lines from your pump to the man-
ifold inlets (R & Q).
Connect your static mixer or hose to the material outlet
(S). Model 215626 has a 1/2 npt(m) outlet, and model
215625 has a 1/4 npt(m) outlet. Model 241692
includes a static mixer with a 3/8 npt(m) outlet.
Fig. 1
05764
R
S
Q
Model 215626 Shown