Structuring and controlling the conference system
Large conference system with simple cabling
For setting up a large conference system with the maximum number of conference
units (i.e. up to 400), you require one ADN CU1 central unit for controlling the con-
ference and additional ADN PS power supplies for powering the conference units.
The conference units are interconnected in cable strings and up to four cable
strings can be connected to each ADN PS power supply.