Checklist
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE
C
ONTENTS
24- or 48-port Gigabit Ethernet Switch (LGB6026A or LGB6050A)
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Power cord—either US, Continental Europe or UK
Console cable (RJ-45 to RS-232)
This Installation Guide
Management Guide CD
OPTIONAL RACK-MOUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)