
14
Be careful to assemble all components
in the sequence they are presented.
mm
Inch
STEP
Pec Dec Cable (88)
Stamped Eye End
Stamped Eye End
2055 mm 6’ 9”
NOTE:
Leave all pulley bolts hand tight until step 15
A. Bolt Pec Dec Cable (88) to Left Pec Dec Cam (P) as shown in diagram 1 using:
One 50 (3/8” x 1” hex head bolt)
One 71 (3/8” nylon lock nut)
B. See diagram 1. Route Cable (88) through Pulley Swivel (AC) on the left side, hold cable in place
with Pulley (C1) using:
One 51 (3/8” x 1 3/4” hex head bolt)
T
wo 74 (3/8” washer)
One 71 (3/8” nylon lock nut)
C. See diagram 1. Route Cable (88) up and into 90 Degree Double Pulley Holder (CC) and install
Pulley (C2) using:
One 51 (3/8” x 1 3/4” hex head bolt)
T
wo 74 (3/8” washer)
One 71 (3/8” nylon lock nut)
B. Insert Cable (88) thr
ough Pulley Swivel (AC) on the right side, hold cable in place by installing
Pulley (C3) as shown in diagram 2 using:
One 51 (3/8” x 1 3/4” hex head bolt)
T
wo 74 (3/8” washer)
One 71 (3/8” nylon lock nut)
C. Attach Cable (88) to Right Pec Dec Cam (S) as shown in diagram 1 using:
One 50 (3/8” x 1” hex head bolt)
One 71 (3/8” nylon lock nut)
36