![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/c/e1/ce10543d-d2ca-48b3-80e4-c31dd254cd7b/ce10543d-d2ca-48b3-80e4-c31dd254cd7b-bg14.png)
3-4
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 3 Connect the Power Supply Units
Connecting the Power
Step 7 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
panel. If the DC-input power supply unit is operating properly, these LEDs will be glowing green.
Step 8 Ensure that the power supply is properly aligned and the installation screw is tightened.
Connect the AC-Input Power Supply Unit
Step 1 Plug the AC-input power cable into the AC-input power receptacle on the AC-input power supply
For AC-input power, we recommend powering the SCE 2000 platform from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
Figure 3-4 Connecting the AC Power
Step 2
Plug the AC power supply cable into the AC power source.
Step 3 Turn the on/off switch to the on position.
Step 4 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
panel. If the AC-input power supply unit is operating properly, these LEDs will be glowing green.
Step 5 Ensure that the power supply is properly aligned and the installation screw is tightened.
IN PO
W
ER B O
K
IN
PO
W
ER A OK
BYPASS 1
210423