A SERVICE OF

logo

Operations 26
5.
Install the air baffle.
6. Install the access panel (on page 21).
7. Install the server into the rack ("Installing the server into the rack" on page 31).
8. Connect each power cord to the server.
9. Connect each power cord to the power source.
10. Power up the server (on page 19).