A SERVICE OF

logo

Hardware options installation 34
11.
Remove the thermal interface protective cover from the heatsink.
CAUTION: To avoid damage to the system board, processor socket, and screws, do not
overtighten the heatsink screws. Use the wrench supplied with the system to reduce the possibility
of overtightening the screws.
12. Install the heatsink. Insert both screws, and then alternate tightening until the heatsink is seated properly.
13. Install the access panel (on page 13).
14. Install the server blade ("Installing a server blade" on page 17).
Mezzanine card option
Optional mezzanine cards are classified as Type I mezzanine cards and Type II mezzanine cards. The card
type determines where it can be installed in the server blade.
Install Type I mezzanine cards on either mezzanine 1 connector or mezzanine 2 connector.