A SERVICE OF

logo

FIGURE 6
STEP 6:
Pull back the SPRING PIN and slide the SAFETY RAILS (9) over the UPRIGHTS (5) until the S]?I~[NG PIN is engaged in
ftrst hole.
¯
Slide the CARRIAGE (3) over the LrpRIGHT FR.AME (1) as sho~ in FIGURE
STEP 7:
¯ Insert one 3 X 2" END CAP (44) into the TOP BOOM (2) as shown in FIGURE
¯ Route end of CABLE (25) (WITHOUT BALL) through the TOP BOOM (2) as shower in FIGURE
¯ SECURELY assemble two 3-1/2" PULLEYS (23) to the TOP BOOM (2) using r¢,-o 3/8 X 2-3/4" BOLTS (28), four
FLANGE SPACERS (42), and t~’o 3/8" LOCK.NUTS (36). See FIGURE 7. (NOTE: BEFORE TI(.;H’rEi~I2qG, MA.KE
THE CABLE (25) IS IN THE GROOVE OF THE PULLEYS.)