![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/5/af/5af21ce3-f852-4745-99a5-8a8f8d8ef4ae/5af21ce3-f852-4745-99a5-8a8f8d8ef4ae-bg5.png)
ASSEMBLY
UNPACK CARTON & INSTALL HANDLE (See
Fig. 2)
J_lh AUTION: Be careful of exposed I
staples when handling or disposing
of cartoning material.
IMPORTANT: WHEN UNPACKING AND ASSEMBLING
TILLER, BE CAREFUL NOT TO STRETCH OR KINK
CABLE(S).
Cut cable ties securing handles.
• Slowly lift handle assembly up, route cable(s) as shown
and align handle holes with handle panel hole and
slot.
Loosely assemble hardware as shown. Be sure the
shorter (3/4" long) hex bolt is assembled in lower
hole of handle. Repeat for opposite side. Tighten all
hardware securely.
Cut cable ties securing tiller to skid and remove tiller
from skid.
Remove screws securing depth stake to skid and dis-
card the screws.
LOCK
NUT WASHER TILLER
HANDLE
HANDLE
PANEL
HEXBO_
5/16-18X1"
HEX BOLT
WASHER 5/16-18X3/4"
TILLER
HANDLES
HANDLE
PANEL
BOLTS
INSTALL DEPTH STAKE ASSEMBLY
(See Fig. 3)
Loosen nut "A'.
Insert stake support between engine bracket halves
with stake spring down.
Bolt stake support to engine brackets with bolts, lock
washers and nuts. Tighten securely. Tighten nut "A".
Depth stake must move freely. If it does not, loosen
support bolt.
ENGINE BRACKET
.4" HALVES
SPRING
HEX BOLTS,
LOCK WASHERS,
AND HEX NUTS
FIG. 3
HANDLE HEIGHT
Handle height may be adjusted to better suit operator.
(See "HANDLE HEIGHT" in the Service and Adjust-
ments section of this manual).
TILLING WIDTH
Tilling width may be adjusted to better handle your
tilling conditions (See "TINE ARRANGEMENT" in the
Service and Adjustments section of this manual).
TINE OPERATION
Check tine operation before first use. (See "TINE OP-
ERATION CHECK" in the Service and Adjustments
section of this manual).
FIG. 2
5