![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/9/3e/93e204c7-a055-4fe9-8c0a-bc7fa681d587/93e204c7-a055-4fe9-8c0a-bc7fa681d587-bg1d.png)
3
I
NSTALLING
THE
S
WITCH
4007
This chapter contains the following topics:
■
Site Requirements for the Switch 4007
■
Preinstallation Guidelines
■
Installing the Chassis
Figure 16 summarizes the installation procedure.
For a Switch 4007 starter kit, you can simplify
the installation proceedure because the chassis is
pre-configured with one power supply, one
management module, one switch fabric module,
and two interface modules.
Figure 16
Switch 4007 Installation Procedure
Install the Chassis and
Optional Devices
• Chapter 3 (In this guide)
3
Install a Power Supply
•
7-Slot Chassis
Power Supply
Installation Guide
4
Install a Power Cable
•
7-Slot Chassis Power Supply
Installation Guide
5
Install a Switch Fabric
Module
• Switch fabric module quick
start or getting started guides
• Switch fabric module
user guides (if available)
7
Install Interface Modules
•
Interface module quick start or
getting started guides
•
Interface module user guides
(if available)
8
Determine Site Requirements
• Chapter 3 (In this guide)
1
Troubleshoot Problems
•
Command Reference Guide
•
Implementation Guide
11
Administer and Operate
the Switch
•
Command Reference Guide
•
Implementation Guide
12
Configure the Switch for
Management
•
Command Reference Guide
•
Implementation Guide
10
Unpack the Switch 4007
Chassis
• “Unpacking Instructions”
(In this guide)
2
Install an EME Management
Module
•
Enterprise Management Engine
Quick Start Guide
6
Switch 4007
Power On the Switch
• Chapter 4 (In this guide)
9
1
2
3
4
5
6
7
8
9