A SERVICE OF

logo

ATTENTION
DAILY CHECK BEFORE OPERATING THE SPINDLE
1. For first time installation, look at “Installing the spindle”
paragraph.
2. Check air supply (5-6 bar.)
3.
Check water supply (4-5 bar.) Check water supply (4-5 bar.)
4. Check ventilation exits.
5. Check for free movement of the shaft.
6. The spindle must be securely clamped to the machine and clea
r
from any distraction.
7. Check for electric connections and command (community
grounding).
8. Start the spindle.
6