A SERVICE OF

logo

Removal and replacement procedures 44
o
If full-length expansion boards are installed, remove the full-length expansion board shipping
bracket as indicated.
PCI riser cage
To remove the component:
CAUTION: To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCI riser cage.
1. Power down the server (on page 27).
2. Extend or remove the server from the rack ("Remove the server from the rack" on page 28, "Extend the
server from the rack" on page 28).
3. Remove the access panel ("Access panel" on page 34).
4. If any full-length expansion boards are installed, remove the full-length expansion board shipping
bracket ("Full-length expansion board shipping bracket" on page 43).