A SERVICE OF

logo

40 en | Subsystem Connection and Operation RAID Subsystem DVA-08K | Installation Manual
F.01U.027.797 | V2 | 2008.08 Bosch Security Systems
This screen appears when the PSUs are turned
on.
Proceeding with controller self-test.
Self-test completed.
Verifying installed cache memory.
System is ready. You can now start to config-
ure the subsystem.
DVA-08K
DVA-08K