A SERVICE OF

logo

Operations 26
3.
Remove the access panel (on page 21).
4. Place the tower server on its side.
5. Remove the air baffle (on page 22).
6. Using a T-15 Torx screwdriver, remove the seven screws on the system board.
Save the screws.
7. Using the wrench provided in the kit, install the seven mezzanine base stand-offs.
8. Install the metal plate on the mezzanine base stand-offs.