Cheetah 18 Installation Guide, Rev. A 3
stacked vertically, pay special attention to the top where tem-
peratures are usually highest.
• Follow the precautions listed above in “Electrostatic discharge
protection.”
• Do not remove any circuit boards from the drive. Return the
entire drive for depot repair if any circuit board is defective.
Removal of circuit boards by personnel not performing depot
repair will damage components and may void the warranty.
• Do not separate the head and disc assembly (HDA) from the
PCB. Return the entire drive for depot repair if the HDA is
defective.
• Do not attempt to disassemble the HDA. It is not field repair-
able. If the sealed HDA is opened by personnel not performing
depot repair, this will damage components and void the
warranty.
As a component, this drive is designed to be installed and oper-
ated in accordance with UL1950, EN60950, CAN/CSA C22.2
950-95, and VDE0805.
Seagate takes all reasonable steps to ensure that its products
are certifiable to currently accepted standards. Typical applica-
tions of these disc drives include customer packaging and sub-
system design. Safety agencies conditionally certify component
assemblies, such as the Cheetah disc drive, based on their final
acceptability in the end-use product. The subsystem designers
are responsible for meeting these conditions of acceptability in
obtaining safety-regulatory agency compliance in their end-use
products and for certifying where required by law. A necessary
part of meeting safety requirements is the provision for overcur-
rent protection on drive SELV supply voltages.