A SERVICE OF

logo

Generating RF Network Design Information 155
Generating RF
Network Design
Information
After 3WXM has calculated the number of MAPs required to provide
wireless coverage, you can generate a work order report. The work order
report provides all of the necessary information for the physical
installation of the 3Com Mobility System. A work order shows where the
MAPs should be installed, WX initial setup configuration information, and
projected RSSI information that is useful when verifying the installation.
After deployment, you can generate a work order with the optional RSSI
projection tables and MAP MAC addresses, and use it for
post-deployment verification.
To generate a work order report
1 Display the floor plan in the Content panel.
2 In the Task List panel, click RF Planning.
3 Under RF Planning, click Work Order Report. The Work Order Generation
dialog is displayed.