Effective March, 1998
IL 33-A1C-1
Page 12
D. Attach the HV Wires to the CPT terminals
to achieve the required voltage.
(See the following table.)
Voltage Required CPT Terminals Used
600 Volt Circuit H1 & H2
480 Volt Circuit H1 & H4
240 Volt Circuit H1 & H3
208 Volt Circuit H1 & H2
E. Route the HV Wires through the hole in the rear
of the Breaker Frame next to the Breaker Stabs
then up towards the top Breaker Stabs. The HV
Wire fuses should be positioned to the outside
of the Breaker.
F. Align the CPT Assembly with the holes drilled in
the left Breaker Frame in Step 3c. Secure the
CPT Assembly to the inside of the left Breaker
Frame, as shown, using the (2) .250-20 × .750"
bolts, (4) flat washers, (2) lock washers, and
(2) nuts supplied.
G. Attach the appropriate label for the Breaker in
a clearly visible position. Four (4) labels are
included with the CPT, one (1) for 600 Volt, one
(1) for 480 Volt, one (1) for 240 Volt, and one (1)
for 208 Volt systems.