A SERVICE OF

logo

4 - 9
ENG
ENGINE DISASSEMBLY
1.Remove:
Starter pulley 1
NOTE:
Hold the starter pulley by the Rotor Holder
to loosen the bolt on the starter pulley.
Rotor holder:
P/N. YU-01235, 90890-01235
2.Remove:
Crankcase cover 1
3.Remove:
Gasket 1
Dowel pins 2
Shaft 3
Washer 4
Idle gear 5 (starter)
4.Remove:
CDI magneto 1
NOTE:
Use the Flywheel puller 2 and Attachment
3.
Flywheel puller:
P/N. YU-33270, 90890-01362
Attachment:
P/N. YU-33278, 90890-04087
4