A SERVICE OF

logo

ATTENTION
DAILY CHECK BEFORE OPERATING THE SPINDLE
1. For first time installation, look at “Installing the spindle” paragraph.
2. Check air supply (5-6 bar.)
3. Check ventilation exits.
4. Check for free movement of the shaft.
5. The spindle must be securely clamped to the machine and clea
r
from any distraction.
6. Check for electric connections and command (community
grounding).
7. Start the spindle.
6