A SERVICE OF

logo

30 CHAPTER 2: INSTALLATION
Installation Overview Figure 3 summarizes the overall installation procedure for the PathBuilder
S330/S310.
Figure 3 General Installation Procedure
Prepare the Site:
Verify clearance around the shelf site
Step 1
Install the optional modules
Install the unit in the rackStep 2
Step 3
Step 4
Step 5
Connect AC or DC power and
Connect I/O cabling and wiring
Connect the management
Fabricate and run cabling and wiring
(optionally) the RPS system
terminal
(optional)