A SERVICE OF

logo

3 - 4
INSP
ADJ
FRONT FENDER
Installation:
Reverse the “Removal” procedures.
Note the following points.
1.Install:
Front fender
1
T
R
.
.
Bolt
2
(front fender and frame):
7 Nm (0.7 m • kg, 5.1 ft • lb)
Nut
3
(front fender and fender
stay):
7 Nm (0.7 m • kg, 5.1 ft • lb)
2.Install:
Front bumper
1
T
R
.
.
Bolt (front bumper and frame):
16 Nm (1.6 m • kg, 12 ft • lb)
3.Install:
Front bumper skid plate
1
4.Install:
Front carrier
1
T
R
.
.
Bolt
2
(front carrier and frame):
34 Nm (3.4 m • kg, 25 ft • lb)
Nut
3
(front carrier and front
bumper)
11 Nm (1.1 m • kg, 8.0 ft • lb)
3