8/30/04
Indusparquet
®
61
(800) 525-BR111(2711)
•
Fax (800) 577-2711
•
www.br111.com
55
55
//
//
11
11
66
66
""
""
&&
&&
77
77
//
//
11
11
66
66
""
""
SS
SS
OO
OO
LL
LL
II
II
DD
DD
II
II
NN
NN
SS
SS
TT
TT
AA
AA
LL
LL
LL
LL
AA
AA
TT
TT
II
II
OO
OO
NN
NN
II
II
NN
NN
SS
SS
TT
TT
RR
RR
UU
UU
CC
CC
TT
TT
II
II
OO
OO
NN
NN
SS
SS
Staple-Down and Glue-Down Installation Instructions
Prefinished Solid 5/16" x 3
1
/
8
" or 7/16" x 2
5
/
8
" x Random Length (11"– 55")
Thank you for choosing BR-111
™
Exotic Hardwood Flooring. Protect your investment; thoroughly review and adhere to the
following installation instructions.
Please note that these are instructions for the experienced hardwood flooring installer. For more detailed information on the
basics of installing hardwood flooring, please contact the National Wood Flooring Association (NWFA) at 1-800-422-4556 or visit
www
.nwfa.org.
Installer/Owner Responsibility
Hardwood flooring is a natural product; therefore defects in the flooring can occur in the manufacturing process or naturally as a
characteristic of the wood. Indusparquet 5/16" & 7/16" hardwood floors are manufactured within accepted industry standards,
allowing for up to 5% defective product based on the original hardwood flooring purchase order. Order 5% additional flooring
product above actual square footage requirements to allow for cutting and grading of material.
Prior to installation, the installer assumes all responsibility for final inspection and quality of the product.
Flooring should be carefully examined for finish and quality. Do not install hardwood flooring that is unacceptable; contact
seller immediately.
The installer must determine that the jobsite environment and sub-floor surfaces meet applicable construction
and material industry standards.
B R - 111
™
declines any responsibility for job failure resulting from deficiencies associated
with sub-floor or job-site environment.
The installer must hold out or cut off defective flooring material during installation. Filler or putty stick may be used to correct
minor flooring defects during installation and is considered a normal procedure.
Basic Tools and Accessories
■
Rubber mallet
■
Pencil
■
Jamb saw or hand saw
■
Chalk line
■
Hammer
■
Tape measure
■
Table saw or band saw
■
Broom
■
Leading brand of hardwood flooring cleaner
■
Calcium Chloride Test (may be needed)
■
Quality moisture meter with manufacturer’s relevant exotic species calibration figures
Additional Tools for Staple-Down Installation
■
Drill with 1/16" Drill Bit
■
4d-6d Flooring Nails
■
Nail Set
■
5/16" Products – Powernail 200/250 (fitted with C-1 Adapter Pad, no shims, 1 1/4" E-Powercleat nails, and
compressor set at 70 psi) www.powernail.com
– Senco SLS20HF – Stanley-Bostitch S32SXBHF – HighPRO AS-4090
Or other machines designed or adapted specifically to 5/16" solid wood flooring
– 1" (minimum) glue-coated staples
■
7/16" Products – Powernail 200/250 (fitted with U-1 Adapter Pad, two shims, 1 1/4" E-Powercleat nails, and compressor
set at 60 psi), HighPRO AS-4090 or other machines designed or adapted specifically to 7/16" solid
wood flooring
– 1 1/8" (minimum) glue-coated staples
■
Moisture Barrier (recommend StrateStuff Safeguard, minimum 6 mil polyethylene film)
Professional Installation Recommended