A SERVICE OF

logo

60133 revG Page 21 of 38
FIGURE 49 FIGURE 50
9. Use five M8 flat washers (P/N #30589), four M8-1.25 x 25mm bolts (P/N #30739) and one M8-1.25 x
20mm (P/N #30700), mount the downpipe to the turbocharger. Hand tight all the bolts. SEE FIGURE 50
10. Using two 5/16” lock washers (P/N #30593) and two 5/16-18 bolts (P/N #30570), secure the dump tube
flange on the downpipe to the wastegate with a supplied wastegate gasket (P/N #20142) in the middle.
11. Apply a small amount of thread sealant to the threads of the supplied 90 degree 1/8-27 NPT to 5/32”
brass barb fitting (P/N #30307) and screw it onto the BOTTOM port of the wastegate. Make sure the
barb fitting is facing upwards. SEE FIGURE 51
FIGURE 51
12. Tighten all nuts and bolts.
Installing the Heat Wrap
1. Using the supplied heat wrap (P/N #31007), wrap the A/C line that sits parallel to the downpipe. Wrap the
line starting from the hard aluminum line at the A/C compressor and go up about 1.5 foot.
FLANGE TO TURBO
FLANGE TO
WASTEGATE
FLANGE TO FACTORY
DOWNPIPE 2
DOWNPIPE P/N #21243
M8-1.25 x 20mm BOLT
HIGH TEMP. RTV