Yamaha QY100 Musical Instrument User Manual


 
The Song Jobs
159
NOTE
The Shift Clock job will not shift data beyond the specified measure range. Events
near the beginning and end of the specified range may therefore sound “bunched”
together in some cases.
Since the Shift Clock job actually shifts the timing of all notes and other events in the
specified measures forward or backward, it can significantly alter the “feel” of the
song. You could move the notes forward (“+” settings) to create a more “laid back”
feel, or backward (“-” settings) to produce a more “driving” feel. Of course, you can
also use Shift Clock to correct timing that is off in the first place.