PAGE 23
FIREBALL INSTALLATION & USER’S GUIDE - M22001-01A1
CHAPTER 2 - SETTING UP FIREBALL
2
Since no two people are likely to
have the same exact audio or video
conguration, the steps involved in
putting the FireBall system together are
not specic to any one piece of audio or
video equipment. Therefore, it may be
necessary for you to customize one or
more of the cables that are included with
this equipment. Please see Appendix A
for a cable pin-out conguration guide.
Depending upon the intricacy of the
audio and video equipment and the
access to each component, installation
should take approximately 2-4 hours.
2
A complete list of the optional equipment
such as CD Changers and Portable
Players may be found on the Escient
website.
Unpack The Equipment
u Carefully unpack all of the FireBall equipment from the shipping container.
v Next, compare it to the following list and make sure you have everything
available before you get started.
• FireBall unit packed in plastic bag
• Wireless keyboard with 3 AA batteries
• Escient 48 button remote control with 2 AA batteries
• Detachable A/C Power Cord - 6'
• S-Video cable (Y-C) - 5'
• Composite Video cable - 5'
• Phone cable - 20'
• S-Link mono cable - 10'
• Dual RCA cable - 5'
• User/Installation Manual
• Open Me First Guide
• Open Me Second Guide
• Ethernet cable - 10' (FireBall E only)