LG Electronics LGENBOX-01 Drums User Manual


 
10
Fix AC module to the PV rack in the following order:
Step1. Peel adhesive label attached on the side of PV frame of AC modules and stick on a piece of paper mirroring
the array to map for monitoring.
Step 2. Place AC modules on the PV rack with a minimum gap of 0.236 inch (6mm) between each module. To
prevent the risk of slipping during installation, mount AC modules one by one. Connect trunk cables to each
mounted AC module. (Refer to Chapter 3-8. Connecting AC Modules)
Step 3. Fixate the PV module to the PV rack on the four mounting holes (marked by points below) with 4 M6
stainless bolts, 4 nuts, 4 spring washers, and 8 flat washers.
(To mount according to the different type of PV racks, refer to the next page under Mounting According to
the Different PV Racks)
Serial No. K2xxxxxxxxxx
MAC Address : 48:D1:8E:40:00:90
Made in Korea
Module frame
Bolt
Flat washer
Flat washer
Spring washer
Nut
Support
Connecting the PV Rack and PV Module
WARNING
To prevent the danger of the electric shock, make sure to turn off the circuit breaker prior to installation.