7
3-4 Measuring AC Voltage of the Utility
Measure the AC voltage of the utility at the distribution panel using a multi-meter. Refer to the table below to
determine the number of modules per array.
AC Voltage
Single phase 240V (per 1-array)
Three phase 208V
(per 3-array)
* For details, refer to Chapter 3-10. Connecting AC Module Array to the Distribution Panel.
* Factory setting of AC voltage of the AC modules is 240VAC. If you want to change the operating AC voltage range, you
need to set grid configuration directly. For details, refer to Chapter 4-3. Configuring the Installation App - Step 5.
Number of Maximum AC Modules
12 units
6 units ⅹ 3 (merge type)
11units ⅹ 3 (split type)
20A Circuit Breaker
2-pole ⅹ 1ea
3-pole ⅹ 1ea
2-pole ⅹ 3ea
After receiving the product, inspect all parts for possible deformity or malfunction.
1 PV module
Converts the solar energy to DC power.
2 Micro inverter
Converts DC power generated by each PV module to AC power.
3 PV frame
Protects and fixates AC module.
4 AC drop cable
Connects a micro inverter to trunk cable.
5 Trunk male connector
Junction connector between AC drop cable and trunk female connector.
6 Trunk female connector
Connects to trunk male connector of the next AC module in the array.
7 Bracket
Fixes trunk cable onto PV frame.
8 Dust cover
Prevents entry of foreign particles.
9 Cable holder
Prevents AC trunk cables from moving during transportation.
※ Warranty is void if it is broken after installed.
3-3 Inspecting Components of the AC Module
1
2
3
4
5
6
7
8
9