LG Electronics LGENBOX-01 Drums User Manual


 
28
1
2
3
Factory setting
Step 5. Setting the grid configuration
1
Enter into Grid Configuration and set the grid configuration to suit your environment.
If the grid configuration is wrong, AC modules may not operate correctly.
2
Press the Set button. It takes about 5 seconds per module for setting.
3
Press the Update button and check that the selected grid setting is correct. If all AC modules are not
updated, please try again.
Step 4. Checking conditions of installed AC modules
1
Enter into AC Module Status to check the operating status of the AC module system.
2
If all AC modules status is not updated, press Back button and wait about 15 minutes until the next
sync period. (Information is updated every 15 minutes.)
3
Enter into AC Module Status to check the operating status of the AC module system again.
If ground fault occurs, AC module automatically detects and stops.