A SERVICE OF

logo

2 - 53
SPEC
Ò Support the throttle cables with the T-bar located
behind the cable guide.
Ó Pass the throttle cables under spark plug leads
#1, #2, #3, and #4, and the wire harness, head-
light lead, main switch lead, right handlebar
switch lead, and left handlebar switch lead.
Install the thermostat, heat protector, throttle
cables, spark plug leads, wire harnesses, and
air cut valve under the cable guide in the respec-
tive order.
Ô To the left slit of the plate
CABLE ROUTING