A SERVICE OF

logo

4 - 74
CHAS
HANDLEBARS
EAS00674
INSTALLING THE HANDLEBARS
1. Stand the motorcycle on a level surface.
WARNING
@
Securely support the motorcycle so that
there is no danger of it falling over.
2. Install:
right handlebar switch
1
NOTE:
@
Align the projection
a
on the right handlebar
switch with the hole
b
in the right handlebar.
3. Install:
throttle grip
1
throttle cable housing
2
throttle cables
grip end
NOTE:
@
Lubricate the inside of the throttle grip with a
thin coat of lithium soap base grease and
install it onto the handlebar.
• Align the projection
a
on the throttle cable
housing with the hole
b
in the right handle-
bar.
• There should be 1 ~ 3 mm of clearance
c
between the throttle grip and the grip end.
WARNING
@
Make sure the throttle grip operates
smoothly.
T
R
.
.
4 Nm (0.4 m · kg)