19
Introducing the R-4 Pro
From the Main screen, you can press the [DISPLAY] button to switch the progress bar area so it shows the
remaining project time (REM: REMAIN).
fig.play-disp2.eps
The Mixer screen
From the Main screen, press the [DISPLAY] button twice to show to the Mixer screen.
This screen lets you adjust the volume balance for monitoring.
fig.play-disp3.eps
Marker display
The number on the left is the number of marker located immediately before
the current time counter value. The number on the right indicates the total
number of markers assigned in the currently selected project.
E indicates the end of the current project.
Monitor level meters These are the output level meters. The output level assigned to the L/R chan-
nels of the monitor is displayed as the final output level after mixing the L and
R channels separately. You can adjust the level of each channel with the chan-
nel level sliders from the mixer screen. The level meter is calibrated at -36, -20,
-12, -6, and -3 dBFS from the left.
Clip level indicators
Power source
Displays the power supply source for the R-4 Pro. When power is supplied via
the AC adapter, a power plug icon is shown; when power is supplied via bat-
teries or an external power supply device (see p. 29), a battery icon is dis-
played.
Date and time or timecode
Displays the current date and time or the timecode.
To change the display, see Connecting to a video device with a time-
code port (p. 84)
Remaining time
During playback, this displays the remaining time from the current location
to the end of the project.
Channel level sliders
These levers adjust the playback level for each channel. Use the left/right
[CURSOR/FINDER] buttons to select a slider, and turn the [SCRUB/VALUE]
dial to adjust the value. Each slider can be adjusted within the range 0–120.
The default value is 100.
* The settings are stored by the R-4 Pro and not in the project. When you
turn off the power, the settings revert to the default value.
* These settings do not affect the recording levels.
Remaining time
Channel names
Channel level meters
Channel level
sliders
Monitor level meters
Output assignments
R-4_e_new.book 19 ページ 2006年11月20日 月曜日 午後1時9分