Promise Technology 15110 Musical Instrument User Manual


 
Index
255
N
Network connections, problems
240
O
Operating Systems, supported 6
OS support for WebPAM PRO 33
Overview 2
Overview of VTrak 2
P
Password, change 85
PATA disk drive
install
13
set jumpers 10
PATA-to-SATA Adapter 13
Ping test, Management port 178
popup messages, meaning 230
Power connection 23
Power LED 24, 65, 133, 226
Power requirements 6
Power supply, replace 196
Power/Activity LED 25
R
Rackmount 8
RAID
Console LUN
181
Level, choices 214
Migration 219
RAID 0 208, 214
RAID 1 209, 214
RAID 10 212, 215
RAID 1E 215
RAID 3 210, 215
RAID 5 211, 215
RAID 50 213, 216
RAID, introduction to 207
Redundant Array of Independent
Disks
207
Replace
cache battery
202
fans 197
RAID controller 205
SEP 204
Reserve Sector, wipe 156
RS-232 connector, pinout 251
RS-232 Serial Connection 22
S
SATA disk drive, install 12
screws, counter-sink 11
SCSI
Activity LEDs
24, 65, 133, 226
cables 16
Channel TID 180
Connection problems 239
daisy chain 20
existing HBA card 241
HBA card, dual channel 15
HBA card, specifications 15
HBA cards, two 18, 21, 241
in-band 181
management 180
multiple VTraks on chain 241
other devices on chain 242
Target ID 20
terminator 17
VTrak, PC, HBA card 18, 19,
20, 21
Serial connection problems 239
SNMP settings 176
Specifications 5
Status Indicators 65, 133
Stripe Block Size, choices 217
Subsystem Management 148
T
Target ID, assign 180
Technical Support 245