Mitsumi electronic QS07J1GF11-T2 Drums User Manual


 
214
3. Display the network configuration setting window and set parameters as follows:
Project window [Parameter] [Network Parameter] [Ethernet/CC IE/MELSECNET]
button
4. Display the refresh parameter window and set parameters as follows:
Project window [Parameter] [Network Parameter] [Ethernet/CC IE/MELSECNET]
button
5. Write the parameters to the CPU module on the master station (standard station), and either reset
or power it off and on.
[Online] [Write to PLC]
In this example, default values were used for parameters that are not shown above. For parameter setting, refer to the
parameter explanation chapter in the following.
User’s manual for the CC-Link IE Field Network master/local module used
or powering off on
RESET