CHAPTER 4 PROCEDURES BEFORE OPERATION
4
CHAPTER 4 PROCEDURES BEFORE OPERATION
This chapter lists the procedures to be performed before operation of CC-Link IE Field Network.
Remark
The programming chapter in this manual provides examples for each procedure (from “System consideration” to “Debug”)
described below. ( Page 209, CHAPTER 11)
Check box
Consider the system configuration and link device assignments.
System consideration
Installation
Mount the master/local module to the safety main base unit.
Safety CPU operation mode check
Check that the safety CPU module is in test mode (the TEST LED
of the safety CPU module is on) after power-on.
Unit test
Perform a unit test on each module.
Wiring
Cable check
Perform a cable test on the master/local module.
To the next page
Connect an Ethernet cable to each module.
Page 47, CHAPTER 5
Page 96, Section 8.1.1
Page 103, Section 8.2.1
QSCPU User's Manual
(Hardware Design,
Maintenance and Inspection)
Page 64, Section 6.3
Page 59, Section 6.1
Page 60, Section 6.2
Manual for slave stations
Page 74, Section 6.4.2